Short-09022026

Halflight News Network Report XXXX19 Cycle

Malfunction in lower hydroponics, delays in harvest expected

Near the end of last cycle, a destabilized environmental control array led to a string of failures across at least four gardens in lower hydroponics. Investigation and repairs are underway, but a delay in harvest is all but confirmed.

Repair work in Central 10B finally resumes

After nearly an entire decacycle, Solaris Circle confirmed last cycle that the supply of gravenstone had been secured, and work is set to resume on the fractured supply passage located in Section B on Central Floor 10. They blame the disruption on escalating tensions in the Windscar desert, which we are yet to confirm.